Log Book for January 4, 2011
Commander's Check-In
Judah Epstein Reporting
Crew Physical Status:
Overall ok. A few crew-members have minor conditions of a cold.
Time Departed/Returned from EVA:
EVA #1: 10:30 / 11:00. Three Crew Members
EVA #2: 15:10 / 16:03. Two Crew Members
Brief Narrative of Field Mission Results:
Crew successfully collected pebble rock and fine sand samples for use in creating a slow sand filter for Judah's Sedimentary Water Filter project.
EVA Data/Interpretations:
EVA #1: Three Crew Members. Crew traveled in the vicinity of the HAB to the North and collected pebble sized rock samples for use in creating a slow sand filter.
EVA #2: Two Crew Members. Crew traveled up to Skyline Rim to find sandstones which will be broken up into sand particles for use in creating a slow sand filter.
Engineering/Hab Maintenance:
EVA radios are functioning.
Greywater line to toilet is now currently functioning.
The water line to the indoor HAB tank is not yet functioning.
Maintenance is being conducted on the ATVs.
Report Transmission Schedule:
CMDR Check-in, ENGR, CMDR Report, Photos, 2 EVA Reports, Science Report
Plans for Tomorrow:
- 07:30 - Breakfast (Two Crew Members)
- 8:00 - Crew exercise
- Engineering checkups
- EVA #3
- 11:30 - Lunch
- Engineering - work on ATVs, and water pumps
- EVA #4
- Preparation of crew experiments
- Engineering checks
- 17:30 - Dinner
- Reports by 20:00
- Food Study Questionnaire
- Showers: Two Crew Members
Inventory:
n/a
Support Requested:
DG plans bring a new hose for the potable water pump.
Miscellaneous:
n/a