Log Book for January 14, 2011
Commander's Check-In
Judah Epstein Reporting
Crew Physical Status:
Good.
Time Departed/Returned from EVA:
EVA #29: 10:03 / 11:45. Jim, Lucinda.
EVA #30: 13:36 / 14:54. Jim, Lucinda, Judah
Brief Narrative of Field Mission Results:
EVAs today consisted of Gigapan robotic testing as well as Satellite data comparison and data collecting in collaboration with a study from Akos Kereszturi.
EVA Data/Interpretations:
EVA #29: Satellite comparison data was attempted to be collected in collaboration with a study from Akos Kereszturi.
EVA #30: Satellite comparison data was collected for the Executive Officer's study and for the study in collaboration with Akos Kereszturi. Gigapan robotic testing was also completed.
Engineering/Hab Maintenance:
Outside greywater line is leaking and maintenance was conducted to repair.
Report Transmission Schedule:
CMDR Check-in, ENGR, CMDR Report, Photos, 2 EVA Reports, 3 Science Reports
Plans for Tomorrow:
- Cooking/Cleaning - Jim/Lucinda
- 07:30 - Breakfast
- Clean Hab
- Pack personal belongings
- Engineering checks
- Lunch
- Crew Handover to ROMARS
- Crew 97 return to Grand Junction
Inventory:
About 10 boxes with cans of food were picked up and brought to the Hab for subsequent crews.
Support Requested:
n/a
Miscellaneous:
Crew 97 thanks Mission Support for virtual and local support of our crew.